Line 32:
Line 32:
<pre>
<pre>
−
Draft (0) --> '''Validated = To prepare / To ship or shipped''' (1) --> '''Closed / Shipped '' (2)
+
Draft (0) --> Validated = To prepare / To ship or shipped (1) --> '''Processed (Closed / Shipped)'' (2)
</pre>
</pre>
−
Legend:
+
Note :
−
* Bold steps means: Qty can't be modified.
+
* For status "Validated", qty can't be modified.
* Number in parenthesis: Numeric value of status in database
* Number in parenthesis: Numeric value of status in database
Line 42:
Line 42:
TODO Evolution à prévoir:
TODO Evolution à prévoir:
−
+
Draft (0) --> Validated = To prepare / To ship (1) --> '''Processed (Closed / Shipped)''' (2)
−
Draft (0)--> Validated = To prepare / To ship (1) --> '''Close / Shipped''' (2)
Cela inclut:
Cela inclut: