Handrail and Reviews: Difference between revisions

From Dolibarr ERP CRM Wiki
Jump to navigation Jump to search
Line 85: Line 85:
* 2011-05-10: Meeting: [[Report GM 201105 (Year 2010-2011)]]
* 2011-05-10: Meeting: [[Report GM 201105 (Year 2010-2011)]]
* 2010-03-16/2010-03-18: Congress: [[Salon Solution Linux 2011]]
* 2010-03-16/2010-03-18: Congress: [[Salon Solution Linux 2011]]
* 2011-04-11: Release of version [[Release 3.0 EN|3.0.0]]
* 2011-04-11: Release of version [[Roadmap_and_Release_3.0.0|3.0.0]]
* March-april: Test ads with adWords on India and Argentina for 2x50 euros.
* March-april: Test ads with adWords on India and Argentina for 2x50 euros.
* 2011-02-01: Buy the congress kit. The kit contains now: A suitcase, Flyers, The rollup, A box for cash, An electric plugs, A cadenas for netbook.
* 2011-02-01: Buy the congress kit. The kit contains now: A suitcase, Flyers, The rollup, A box for cash, An electric plugs, A cadenas for netbook.
Line 93: Line 93:
* 2010-11-27: Meeting: [[Compte rendu CA 201011 (Hackweek)]]
* 2010-11-27: Meeting: [[Compte rendu CA 201011 (Hackweek)]]
* 2010-11-9/10: Forum PHP 2010: [[Compte rendu Forum PHP 2010]].
* 2010-11-9/10: Forum PHP 2010: [[Compte rendu Forum PHP 2010]].
* 2010-09-29: Release of version [[Release 2.9 EN|2.9.0]]
* 2010-09-29: Release of version [[Roadmap_and_Release_2.9.0|2.9.0]]
* 2010-07-13: Congress: [[Compte rendu RMLL juillet 2010]].
* 2010-07-13: Congress: [[Compte rendu RMLL juillet 2010]].
* 2010-06-20: Launch the market place DoliStore: http://www.dolistore.com
* 2010-06-20: Launch the market place DoliStore: http://www.dolistore.com

Revision as of 07:39, 7 May 2014

This page presents (reverse chronological order), all major events done by the Dolibarr foundation (by of for its members), with reports and reviews when applicable.

So this is the main area to have information on what the foundation did and follow the foundation life. But you can also follow us on other channels (Facebook, Twitter, mailing-lists, etc...) . For this, take a look at the page FAQ How to be informed on news about Dolibarr project.


Orientation.png Main done action (with review if available)

Note that only actions related to the Dolibarr foundation are reported here. Works done by Dolibarr development team (new versions, changelog, minor or snapshot releases) are not reported.

Year 2013-2014

  • 2014-04-25: The first "balance sheet" ("Bilan comptable"), for year 2014 has been released.
  • 2014-04-20: Web site www.dolibarr.fr has been updated to Joomla 3.5.2 (new site has now a responsive design and forum problems are solved). We are working on www.dolibarr.org now.
  • 2013-04-12: Dolibarr foundation add dolibarr.pt into its list of reserved domain names.
  • 2014-04-10: Version 3.5.2 has been released.
  • 2014-03-10: Version 3.5.1 has been released.
  • 2014-02-07: No more exception for language fr_FR, es_ES and ca_ES for translation. Those languages are now translated into transifex too.
  • 2014-01-31: Version 3.5.0 has been released.
  • 2014-01-10: Reopened advertising campaigns: Budget for 2014 is 2400€.
  • 2014-01-05: Release maintenance version 3.4.2.
  • 2013-12-31: Develop and publish the first infographic designed for Dolibarr project. Title of infographic was: Restrospective 2013.
  • 2013-12-27: Move DNS server (historically powered by http://www.nltechno.com) to the DNS powered by OVH (the web hosting service used by the Dolibarr foundation for other tools too).
  • 2013-12-05: We hold Dolibarr advert invest on social networks, because we finished to consume budget of the year 2013 (We were allowed to invest 10% of amount in our bank account the 1st of January). A feedback is available on page Social_Networks_Ads_Feedbacks.
  • 2013-11-15: Version 3.5 is frozen. 3.5 branch is created. See definition on page.
  • 2013-11-02: Clean all Dolibarr social networks (removed duplicate channels and changes to match rules of networks). Each channel is now owned by several members of the foundation board.
  • 2013-10-28: Start a 1 week twitter campaign for Dolibarr twitter account (see Social Networks Ads Feedbacks).
  • 2013-10-16: Start a 2 month facebook campaign for Dolibarr facebook page English, french, spanish and greek page (see Social Networks Ads Feedbacks).
  • 2013-10-14: Release maintenance version 3.4.1.
  • 2013-10-13: Release maintenance version 3.3.4.
  • 2013-09-15: Dolibarr foundation add dolibarr.cn into its list of reserved domain names.
  • 2013-09-13: Add SPF setup into dns of @dolibarr.org mails.
  • 2013-09-01: First add for Dolibarr is published into Press (Linux Pratique) => No significative change into web site traffic.
  • 2013-09-01: Extend ads with adwords to united kingdom and south america and spain.
  • 2013-08-31: Define emails alias for all local communities.
  • 2013-07-31: Release version 3.4.0.
  • 2013-07-31: Buy and setup a Hootsuite dolibarr account to follow all social networks at once on one tool (rss, facebook, twitter, linkedin, google+, google news, slideshare, flickr...)
  • 2013-07-30: Enhance http://www.dolistore.com tools to send email to supplier when their module is bought.
  • 2013-07-20: Generate first accountancy reports for Dolibarr foundation book keepers using defined procedure.
  • 2013-07-15: Release version 3.3.3.
  • 2013-06-01: Migration of dolibarr.org and asso.dolibarr.org onto the new server of foundation (virtual servers).
  • 2013-05-28/2013-05-29: Congress: Salon Solution Linux 2013.

Year 2012-2013

  • 2013-04-20: Meeting: Report GM 201304 (Year 2012-2013)
  • 2013-04-19/2013-04-21: DevCamp Montpellier April 2013 Organisation
  • 2013-04-12: Presentation of Dolibarr at OpenExpo Barcelona, Spain
  • 2013-04-01: Project of the week at sourceforge.net (1st - 7th of april)
  • 2013-03-26: The Dolibarr foundation apply to Google Summer of code as a mentor organization.
  • 2013-03-25: Migration of demo.dolibarr.org onto the Dolibarr foundation server.
  • 2013-03-20: Release of version 3.3.1.
  • 2013-03-19: Presentation dolibarr to the ecommerce day, Metz (world trade center)
  • 2013-02: Release of version 3.3.0.
  • 2013-02: Setup of full backup of VM for the Dolibarr foundation servers. Backups are also saved onto platform of different foundation members of the board.
  • 2013-01: Migration of dolistore.com, dolibarr.fr, doliforge.com onto the new server of foundation (virtual servers).
  • 2013-01: The foundation now use a VAT rate (19.6%) for invoices on Dolistore.com
  • 2012-11-15: Presentation of Dolibarr at OpenExpo Madrid, Spain
  • 2012-09-20: Release of version 3.2.2.
  • 2012-09-01: Release of version 3.2.1.
  • 2012-07-07/12: RMLL à Genève.
  • 2012-07-01: Release of version 3.2.0.
  • 2012-07-19/2012-07-21: Congress: Salon Solution Linux 2012.
  • 2012-04-15: First contacts to create a local community in Venezuela.
  • 2012-04-02: Enhance the developer report page into DoliStore.com (add filter on date).

Year 2011-2012

  • 2012-06-21: Meeting: Report GM 201206 (Year 2011-2012)
  • 2012-03-01: First contacts to create a local community in Portugal and Germany.
  • 2012-03-01: Release of version 3.1.1.
  • 2012-03-01: Web site dolibarr.org and dolibarr.fr were redesigned.
  • 2012-02-15: Add a guideline page to describe volunteers how to create a Dolibarr community: Create a Dolibarr local community.
  • 2012-02-28: The Dolibarr Preferred Partner program is now described and ready to run.
  • 2012-01-22: Changes into DoliStore.com. It is now easier to navigate into products and add subcategories to categories. This change was required because of module increase available on DoliStore.
  • 2012-01-20: Extend adWords campaign on India and South america/Spain for 2x100euros.
  • 2012-01-17: Add a new AntiSpam filter on Dolibarr wiki documentation (http://wiki.dolibarr.org). Submission of rubbish content seems to be stopped.
  • 2012-01-01: Release of version Release 3.1.0.
  • 2011-11-06: Extend ads with adwords to united kingdom and south america and spain.
  • 2011-10-20: Synchronize download area of dolibarr.org and dolibarr.fr (available packages are now always same).
  • 2011-10-10: Area for download of packages have been redesigned to make release easier.
  • 2011-10-01: Move officially source code management from Savannah to GitHub
  • 2011-07-02: Subscription process can be done automatically (including paypal or credit card payment)
  • 2011-05-20: Add SSL certificate on dolistore.com

Year 2010-2011

Year 2009-2010

Before genesis

Orientation.png TODO Tasks

TODO of the foundation