Change Control Pro: Difference between revisions

Jump to navigation Jump to search
Updated Change Control Pro documentation for version 1.1.3, including the new module ID, redesigned interface, upgrade instructions and updated screenshots.
(Created documentation page for Change Control Pro v1.0.0, including features, workflow, installation, configuration, audit trail and PDF reporting.)
Tag: 2017 source edit
(Updated Change Control Pro documentation for version 1.1.3, including the new module ID, redesigned interface, upgrade instructions and updated screenshots.)
Tag: 2017 source edit
 
Line 1: Line 1:


[[File:01_change_control_pro_cover.png|center|900px|Change Control Pro]]
[[File:01_change_control_pro_cover.png|center|900px|Change Control Pro]]
Line 30: Line 29:
*Responsive desktop and mobile interface
*Responsive desktop and mobile interface
*English and Romanian translations
*English and Romanian translations
==What's new in version 1.1.3==
Version 1.1.3 introduces a redesigned and more responsive Change Control interface while preserving the complete workflow and auditability of previous releases.
[[File:02_dashboard_and_change_register.png|center|900px|Change Control Pro Dashboard]]
Main improvements:
*Module ID updated to the reserved PanciucSoft ID '''210135'''
*Redesigned dashboard with KPI cards and workflow overview
*Improved Change Register with responsive filters and status indicators
*Modernized Change Request creation and detail pages
*Improved Impact Assessment and Risk Assessment presentation
*Modernized Approval Workflow and Implementation / Action Plan
*Improved Effectiveness Check presentation
*Redesigned read-only Audit Trail
*Consistent priority, risk and status badges
*Improved desktop and mobile responsiveness
*Complete regression testing of the workflow from Draft to Closed
*PDF Change Control report verified with the complete Audit Trail
===Upgrade from version 1.0.0===
Because the module ID was changed to '''210135''', users upgrading from version 1.0.0 should:
#Deactivate the previous Change Control Pro module.
#Replace the module files with version 1.1.3.
#Reactivate Change Control Pro.
#Review permissions for non-administrator users if necessary.
Existing Change Control records remain stored in the same database tables.


==Workflow==
==Workflow==
Line 43: Line 74:
==Creating and Tracking Change Requests==
==Creating and Tracking Change Requests==


[[File:02_create_and_track_change_requests.png|center|900px|Create and Track Change Requests]]
[[File:03_responsive_change_request.png|center|900px|Responsive Change Request]]


A new Change Request can be created directly from the Change Control Pro menu.
A new Change Request can be created directly from the Change Control Pro menu.
Line 68: Line 99:
==Impact Assessment==
==Impact Assessment==


[[File:03_impact_and_risk_assessment.png|center|900px|Impact Assessment and Risk Assessment]]
[[File:04_impact_and_risk_assessment.png|center|900px|Impact and Risk Assessment]]


The Impact Assessment stage identifies the elements that may be affected by the proposed change.
The Impact Assessment stage identifies the elements that may be affected by the proposed change.
Line 134: Line 165:
==Approval Workflow==
==Approval Workflow==


[[File:04_approval_workflow_and_implementation_plan.png|center|900px|Approval Workflow and Implementation Plan]]
[[File:05_approval_implementation_effectiveness.png|center|900px|Approval Implementation and Effectiveness]]


After the Risk Assessment has been completed, the Change Request can be submitted for approval.
After the Risk Assessment has been completed, the Change Request can be submitted for approval.
Line 180: Line 211:


==Effectiveness Check==
==Effectiveness Check==
[[File:05_effectiveness_check_and_controlled_closure.png|center|900px|Effectiveness Check and Controlled Closure]]


The Effectiveness Check verifies that the implemented change achieved the intended result.
The Effectiveness Check verifies that the implemented change achieved the intended result.
Line 206: Line 235:
==Audit Trail==
==Audit Trail==


[[File:06_audit_trail_and_pdf_report.png|center|900px|Audit Trail and PDF Report]]
[[File:06_audit_trail_desktop_mobile.png|center|900px|Audit Trail]]


Change Control Pro includes an automatic read-only Audit Trail.
Change Control Pro includes an automatic read-only Audit Trail.
Line 242: Line 271:


Change Control Pro can generate a complete PDF report for a Change Request.
Change Control Pro can generate a complete PDF report for a Change Request.
[[File:07_complete_pdf_report.png|center|900px|Complete PDF Change Control Report]]


The PDF report may contain:
The PDF report may contain:
Line 315: Line 346:
==Compatibility==
==Compatibility==


'''Module version:''' 1.0.0
'''Module version:''' 1.1.3
 
'''Module ID:''' 210135


'''Dolibarr compatibility:'''
'''Dolibarr compatibility:'''
156

edits

Navigation menu