Report board meeting 20260825 teleconf: Difference between revisions

Jump to navigation Jump to search
m
Tag: 2017 source edit
Tag: 2017 source edit
Line 22: Line 22:


Control was done in july. Around 140 points are ok but there is still 1 non-conformity point reported (only for certification, software is ok for attestation).  
Control was done in july. Around 140 points are ok but there is still 1 non-conformity point reported (only for certification, software is ok for attestation).  
Still waiting feedback of LNE about our answer done in end of june on this 2 points
Still waiting feedback of LNE about our answer done in end of june on this point.


Note: Problem will not be solved quickly, so users are invited to obtain a "Conformity statement" that can be provided by their integrator or reseller instead of waiting for the public "Certification".
Note: Problem will not be solved quickly, so users are invited to obtain a "Conformity statement" that can be provided by their integrator or reseller instead of waiting for the public "Certification".

Navigation menu