363
edits
Atm-maxime (talk | contribs) No edit summary |
Atm-maxime (talk | contribs) No edit summary |
||
| Line 27: | Line 27: | ||
* Administrative tasks done by Philippe Grand in October and November | * Administrative tasks done by Philippe Grand in October and November | ||
** https://docs.google.com/spreadsheets/d/1UcCgPJQgg3BvQrn6TjjmUsvPkCyok2-lAm8Zzh1hurU/edit#gid=0 | ** https://docs.google.com/spreadsheets/d/1UcCgPJQgg3BvQrn6TjjmUsvPkCyok2-lAm8Zzh1hurU/edit#gid=0 | ||
** Allowed budget is OK, not used fully, so we keep it like this. Philippe will continue. | |||
* Increase the quality control of the modules to activate in DoliStore | * Increase the quality control of the modules to activate in DoliStore | ||