Bureaucrats, emailconfirmed, Administrators
44
edits
Rdoursenaud (talk | contribs) m (Updated my arrival and departure time) |
No edit summary |
||
| Line 259: | Line 259: | ||
= Work done during Event = | = Work done during Event = | ||
-* Upgrade Tuleap hosted on doliforge.org -> version 6.11.99.13. Mylin connector now available for Eclipse but not for Dolibarr ERP/CRM project (tracker is too old) : https://marketplace.eclipse.org/content/mylyn-connector-tuleap-open-alm | |||
To be filled after the event | To be filled after the event | ||