Module Timesheet

From Dolibarr ERP CRM Wiki
Revision as of 16:48, 28 September 2016 by Delcroip (talk | contribs)
Jump to navigation Jump to search

<keywords content="timesheet, Dolibarr, interface, project, task, report, approval" />

Informations

Module name timesheet
Editor / Editeur delcroip
Download or buy page / Page achat ou téléchargement www.dolistore.com
Status / Statut / Estado Stable
Prerequisites / Prérequis projects Dolibarr min version 3.5.0    Dolibarr max verion 4.0.1
Last update date / Date mise à jour fiche / Fecha última actualización 2016-09-28
Note / Nota Latest Module version: 1.5.1


Features

- Timesheet interface for all the user task per week - Generate report on user and on project per month - whitelist to show only some project/task (if no whitelist define all task are showed) - Approval of the timesheets per the N+1

Timesheet timeentry.jpg

Change log from 1.5

Support dolibarr 4.0.1 hidden option to join file to timesheets via the setting TIMESHEET_ADD_DOCS Change log from 1.4.3:

Timesheet approval by N+1, Reminder (email) for to be approved timesheet possible through dolibarr planned tasks admin wiew for the Approval (change a approval status outside the normal approval flow) Home box with the pending timesheet to be approved Blocking some weekdays (e.g week ends) Holiday showed in the timesheet Holiday time can be included in the timesheet totals Typo correction for French. Posibility to add a note Compatible with dolibarr 3.9.2 Change log from 1.4.1:

correction of the Spanish language (thanks to vinclar) possible to deactivate the dolibarr Ajax for the dropdown list for the setup page (in case of issue to add whitelist) keep the whitlistmode after submit / go to date / next / previsous week Change log from 1.4:

bugfix for the tasktime date in the project page link to have the different whitelist behaviour (black list, and none) Spanish language (google trad) typo correction for French support the print mode for timesheet & the report show the project open to everyone on the new whitelist page Change log from 1.3.7:

layout improvement: timesheet, setup page, reports whitelist to show only some project/task taslk column customisation new task column: company, parent task new report option: report all, export friendly layout user report available for the N-2, N-3 Change log from 1.3.6:

compatible avec dolibarr 3.7 Change log from 1.3.3:

Works with PHP<=5.3 Possibility to remove the 0:00 Color code for already filled tasktime / new tasktime and error Bux fixes in the report Better date dialog N+1 is able to check the user report of his N's