Events-Todo-Journal
Introduction
Software used to manage tasks/plannings/agenda (like Outlook, Lightning, Webcalendar, etc) can manage 3 different notions (normalized in norm RFC2445) that are:
- Event (event in the norm)
- Task (to-do in the norm)
- Journal (journal in the norm)
This 3 definitions are nearly similar but they are different terms and are used for different goals. This page describe the differences between each of them.
Event and rendez-vous (event)
An event (event in the norm), is something to define an action (a instant action or an action with a long duration that is in past or future).
Events has the folowwing properties:
- A label (In the norme ical: summary)
- A description (Dans la norme ical: description)
- A start date (Dans la norme ical: dtstart)
- Une date de fin (Dans la norme ical: dtend) ou une durée (Dans la norme ical: duration) mais c'est l'un ou l'autre et pas les deux.
- Un lieu, comme un nom de salle par exemple (Dans la norme ical: location)
- Une priorité (Dans la norme ical: priority)
- La transparence (dans la norme ical: transp) qui dit si les acteurs sont rendus indisponibles par cette tache.
- Un statut (tentative, confirmé ou annulé), rarement utilisé.
- D'autres informations moins structurantes.
Exemple d'utilisation: Cela correspond aux informations que l'on voit dans les calendrier Outlook (onglet Calendrier), Evolution ou Thunderbird/Lightning On utilise les "events" pour stocker les rendez-vous par exemple, mais peut aussi être utilisé pour stocker un travail à faire dans une plage de date donnée.
Into Dolibarr: This concept is managed by Module Agenda. Dolibarr has just added a percentage.
The tasks (to-do)
A task has the following properties:
- A label (In the ical norm: summary)
- A description (In the ical norm: description)
- A start date (In the ical norm: dtstart)
- An end date (In the ical norm: due) or a duration (In the ical norm: duration) but one or other not both.
- A percentage of accomplishment (In the ical norm: percent-complete).
- A priority (In the ical norm: priority).
- A status (running, confirmed or canceled)
- Other informations less important.
Example of use case: This is same thing that you can found into Outlook Tasks feature (tab Tasks), Evolution or Thunderbird/Lightning. We use then in most cases to manage projects.
Into Dolibarr: This concept is managed by Module Projects.
The journals (journal)
A journal entry is an information. It has following properties:
- A label
- A description
- An information date
- A location
- A status (draft, confirmed, deleted).
- Other information less important.
Example of use case: Manage a personal diary.
Into Dolibarr: This concept does not exists in any standard module provided with Dolibarr.