Report board meeting 20140416 devcamp



Title/Date/Location

  • Title: 20140316 DevCamp
  • Date: 20140316
  • Location: Valence DevCamp

Presents

Valid members of the board (subscription up to date), present:

Maxime Florian Jean Laurent Jean-François Philippe

Subject

  • Create a subject Specifics Dev on the forums ?
  Before create this topic we wait until next devcampc to officially  launch http://funding.dolibarr.fr/ where still need define "la gestion des droits de consultation et lien avec les autres outils de l'asso..."

The SPIP project behind funding.dolibarr.org is on DoliForge.


  • No new Dolibarr Prefered Partner Request


  • Use GitBug as maintenance tools :

We try to migrate Tuleap on new version => KO. For the new version CentOS 6.4 (x64) is needed. At least put a link to the bug tracker on the dolibarr.fr and dolibarr.org

  • Dolibarr ERP & CRM © Deposit Trademark

2 providers in short list => options (1) 3 * 8000€ => options (2) 13000 € (including US but that is not wished) Let's see the new offers with removing US, and other adaptation


  • New Web Site dolibarr.fr

http://vps47321.ovh.net/ Still CSS point to solve

  • TODO : Plan General assembly in April

Vote CA vote bilan morale vote bilan comptable Appel à candidature



To discus later In asso.dolibarr.org/dolibarr :

  • A) Before working on any other service/enhancement that the foundation can do/offer, we should enhance automation of already existing tool.

For example, we should: - create a module to sync permission of unix account onto dolibarr foundation servers from dolibarr foundation manager. - upgrade tools on server (joomla, doliforge, ...) - automation of payment when a subscription is renewed

   Tools spécifications :
   Members validated (payment ok) into Dolibarr of Dolibarr fundation :
   => Create wiki account=> plugin media wiki
   => Create Doliforge account => plugin Tuleap
   => Create DoliStore account => plugin Prestashop
   => Create dolibarr.org, dolibarr.fr account => Plugin Joomla
   => Link paypal members paiement to members status
   => Mailing list => Plugin MailMan done => to test
   => Create unix account
   If members is pass to resiliated =>  remove all acccess
   Désactivé Dans les outils si membre résilié

=> Why not use a LDAP directory?

   Still on the road, check after new dolibarr.fr and dolibarr.org if there is possiblity to fund all this stuff    
C) Draft of Dolibarr integrator label
    => Difficulté d'évaluer le serieux des potentiels candidats... Idée: différencier des échelons 

=> The management of preferred partner program is already a program that consume a lot of time, difficult to find for the foundation. Having a more complex system will increase the problem. It is better to do less correctly that engaging into doing more without doing it correctly. Ok to do so, but only when point A will be finished.

    Par exemple Mon-dolibarr.fr dans les partenaire cloud privilégié alors que A3sys n'est pas Preferred Partner

=> Mon-dolibarr.fr n'est pas dans les partenaires privilégiés, mais juste dans la liste des sociétés qui se sont déclarées. Seul les preferred partner sont privilégiés (ajoutés en premier). La question est-elle "faut-il supprimer le référencement de toute société qui n'est pas Prefered Partner" ? Je pense que non, car cela empeche le développement de l'echosystem et toute société ne commence pas directement dans dolibarr en étant directement prefered partner.

    => To discuss 
   Task to do by Florian henry => Resend CGV to DoliStore sellers, with motivation letters to keep module up to date and new Dolistore module validation rules (done ?)


  • D) Doliforge "Demande de promotion d'annonce sur Doliforge" process
   To discuss 
  • E) Vendre 1-2 espaces annonces pub sur sites Dolibarr pour des services autour de Dolibarr en plus de la pub google (qui promeut les autres ERP...)
  To discuss next time (part solved by point on advertising budget)

=> This need to develop tools to manage this: following advertisers, payments, documentations, juridical rules, etc. Who is ok to work on this ?

  • New dolibarr.fr joomla progress ?
  => ne pas perdre les datas (articles, news, forums)
  => derniere version de kunema+joomla
  => migrer  le template joomla.
  => lancer un appel sur un site genre codeur.com pour plus d'impartialité et communiquer sur cet appel. Fixer un budget max et les attentes
  => conserver les urls
  => garder un site simple pour simplfier maintenance
  (optionnal)=> Intégré une banniére de pub personnalisé (pour les prestataire qui payer pour être dessus (following advertisers, payments, documentations, juridical rules) limité au prestataire autour de dolibarr)
  
  Maxime va crée une  annonce sur codeur.com et en plus new sur forum et new sur news thread de org et fr
  • Explain new external1/external2... feature

=> I removed part about coding/development, because this status of the foundation is not to define this. The foundation goal is limited develop (as "promoting" not as "coding") Dolibarr. Coding is goal of development team (so coding discussion would be at good place into a devcamp but not into dolibarr foundation meeting). This must appears into task tracker instead...

* Road map :
Target 3.5 : 
Clean all class (must respect CRUD with user in parameters
Extrafield and multicompany feature
Replace all $_POST/$_GET by GETPOST
Add webservice as module extention as done for dictionnary
Clean all class (must respect CRUD with user in parameters)
    Vérifier qu'il y a des transactions partout où il faut (insert update, delete)
Normalized usage of setEventMessage instead of dol_msg_print...
    Modules CRM : Commercial (gestion d'affaires / opportunités), Marketing (Campagnes)
    Intégration d'e-mails automatique (envoyés / reçu)
    Intégration téléphonie
    Gestion de production
    Gestion de stock => Réservation de stock, et gestion des retours échanges
    Gestion des déclinaisons produits
  • DevCamp

ATM propose d'accueillir l'évènement à Valence (France). Situé près TGV/autoroute. Dispo : grande salle de réunion 20 places assises avec vidéo proj. Maxime va faire un sondage sur le dolibarr de l'asso pour fixer une date. Du vendredi après midi au dimanche soir. + programme Prévoir demie-journée spéciale Integrateur Reprendre les règles de celui à Montpellier / Fixer une limite sur le nombre de participants. à 25/30 ça risque de faire juste. Cf lien de l'année précédente : http://wiki.dolibarr.org/index.php/DevCamp_Montpellier_April_2013_Organisation

  • Spam sur la forge

Dans Tuleap on peut forcer la création d'un compte pour consulter le site => On perd les dépôts et les pages publiques. JF propose un sondage pour cette question du login systématique sur doliforge Stats de doliforge à ce jour:

Utilisateurs actifs ou restreints: 674 Par status: 674 actif(s), 0 restreint(s), 5 suspendu(s), 53 détruit(s), 0 validé(s), 0 en attente, total : 732 Utilisateurs actifs: Les dernières 24 heures: 11 La semaine dernière: 26 Le mois dernier: 62 Les 3 derniers mois: 101