Table llx element time: Difference between revisions
Jump to navigation
Jump to search
m (Eldy moved page Table llx projet task time to Table llx element time) |
|||
| (3 intermediate revisions by 2 users not shown) | |||
| Line 7: | Line 7: | ||
= Content/Contenu/Contenido = | = Content/Contenu/Contenido = | ||
{{flag en}} Contains the time | {{flag en}} Contains the time spend by actors of a project task at a given time. | ||
{{flag fr}} Contient | {{flag fr}} Contient le temps passé par acteurs et par date sur une tâche de projet. | ||
{{flag sp}} Contiene los tiempos invertidos por los actores relacionados a un proyecto. | {{flag sp}} Contiene los tiempos invertidos por los actores relacionados a un proyecto. | ||
| Line 15: | Line 15: | ||
= Structure = | = Structure = | ||
== Table == | == Table == | ||
{| align="left" width="100%" border="0" cellpadding="1" cellspacing="0" class="dolbox" | |||
{| | |||
|style="background-color: #e9e9ef"| <b>Field</b> | |style="background-color: #e9e9ef"| <b>Field</b> | ||
|style="background-color: #e9e9ef"| <b>Type</b> | |style="background-color: #e9e9ef"| <b>Type</b> | ||
| Line 47: | Line 46: | ||
| NULL | | NULL | ||
| | | | ||
| date | | date time when the actor has spend time on the task (started to work) | ||
|- | |- | ||
| task_duration | | task_duration | ||
| Line 55: | Line 54: | ||
| NULL | | NULL | ||
| | | | ||
| duration | | time spend, duration from the date time above | ||
|- | |- | ||
| Line 64: | Line 63: | ||
| NULL | | NULL | ||
| | | | ||
| ID of user | | ID of user or contact having spend time ([[Table llx element contact]]->fk_socpeople) | ||
|- | |- | ||
| note | | note | ||
| Line 72: | Line 71: | ||
| NULL | | NULL | ||
| | | | ||
| | | commentary notes | ||
|} | |} | ||
== Keys == | == Keys == | ||
{| align="left" width="100%" border="0" cellpadding="1" cellspacing="0" class="dolbox" | |||
{| align="left" width="100%" border="0 | |||
|style="background-color: #e9e9ef"| <b>Key</b> | |style="background-color: #e9e9ef"| <b>Key</b> | ||
|style="background-color: #e9e9ef"| <b>Type</b> | |style="background-color: #e9e9ef"| <b>Type</b> | ||
Latest revision as of 12:05, 18 June 2024
The documentation related to other tables is available on the page: Table SQL
La documentation relative aux autres tables est disponible sur la page: Table SQL
La documentación relativa a otras tablas se encuentra disponible en la página: Table SQL
Eine Dokumentation zu weiteren Tabellen ist auf dieser Seite verfügbar: Table SQL
与其他表相关的文档请参阅:Table SQL
Content/Contenu/Contenido
Contains the time spend by actors of a project task at a given time.
Contient le temps passé par acteurs et par date sur une tâche de projet.
Contiene los tiempos invertidos por los actores relacionados a un proyecto.
Structure
Table
| Field | Type | Null | Key | Default | Extra | Description |
| rowid | int(11) | NO | PRI | auto_increment | technical index | |
| fk_task | int(11) | NO | ID of task (llx_projet_task->rowid) | |||
| task_date | date | YES | NULL | date time when the actor has spend time on the task (started to work) | ||
| task_duration | double | YES | NULL | time spend, duration from the date time above | ||
| fk_user | int(11) | YES | NULL | ID of user or contact having spend time (Table llx element contact->fk_socpeople) | ||
| note | text | YES | NULL | commentary notes |
Keys
| Key | Type | Fields |
| PRIMARY | PRIMARY | rowid |